Offshore campaigns, planned to the weather.
Offshore field services planned around weather windows, marine logistics and the interfaces between every party on the job.
Offshore
Offshore, the plan is the work. Weather, vessels, bed space and permits all have to line up.

We build the campaign plan with those constraints in from the start, agree it in writing with every party, and keep it current as conditions change.
- Campaign plans
- Built around weather windows.
- Interfaces
- Every party's role agreed up front.
- Reporting
- Daily progress in writing.
Scope
What offshore support covers.
Campaign planning
Sequencing, weather windows and contingency built into the plan.
Marine logistics
Vessel, cargo and personnel movements coordinated with the work.
Interface management
Clear responsibilities between operator, contractors and vendors.
Offshore maintenance
Planned maintenance and modification work on offshore facilities.
Mobilisation and demobilisation
People, equipment and documentation ready before anyone sails.
Offshore planning
What an offshore campaign plan covers.
Weather windows
Operating limits set for each activity, by significant wave height, wind and visibility, with waiting-on-weather built into the schedule.
Marine operations
Vessel selection, crew transfer method, lifting plans and marine warranty surveyor approvals where required.
POB and bed space
Personnel on board planned day by day, so the right people are offshore at the right time.
SIMOPS
A simultaneous operations matrix agreed with the operator, so work alongside production stays controlled.
Rig moves
For jack-up support: site survey data, preload plans and punch-through risk reviewed before the move.
Emergency response
Bridging documents to the operator's emergency response plan, including medevac and standby arrangements.
Risks and controls
The offshore risks we plan for.
| Activity | Key risk | How we control it |
|---|---|---|
| Personnel transfer | Falls, crushing | Approved transfer methods, weather limits, trained crews |
| Marine lifting | Dropped objects, dynamic loads | Lift plans, sea-state limits, certified rigging |
| Work alongside production | Hydrocarbon release | SIMOPS matrix, permits, isolations |
| Weather | Unsafe working conditions | Activity limits and stop-work authority |
| Remote location | Delayed emergency response | Bridging to the operator's ERP, medevac plans |
Safety and standards
Zero harm
Our goal on every project. Work is planned around the people doing it, and safety comes before schedule.
- Stop-work authority
- Anyone on an Arrikaz project can stop work that isn't safe, without question.
- Checked standards
- Work is checked against agreed standards before, during and after it happens.
- Competent teams
- Every team is checked for the skills, certification and safety record its work requires.
- Clear reporting
- Incidents, near misses and risks are reported in writing and acted on.

Questions
-
Operating limits are set per activity and waiting-on-weather is built into the schedule and the commercial terms, so downtime is planned for, not argued about.
-
Yes. We bridge to the operator's safety management system and emergency response plan before mobilisation.
-
Yes, including rig-move planning and the interfaces between drilling contractor, operator and marine contractors.